upleb.uk

Public git repos — served from a NIP-34 GRASP relay at git.upleb.uk

summaryrefslogtreecommitdiff
path: root/docs/archive/2025-11-04-evening/session-complete.md
blob: 56cb711f4f79cf7103caa16d598643181f9ffd80 (plain)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
# Session Complete: Ready for Test Validation Phase

**Date:** 2025-11-04  
**Status:** ✅ READY TO BEGIN

---

## ✅ What We Did

### 1. Strategic Planning
- Analyzed test-first vs TDD parallel approaches
- Decided to validate grasp-audit against ngit-relay first
- Validated hybrid architecture (git2 + git-http-backend + system git)

### 2. Documentation
- Archived all planning documents to `docs/archive/2025-11-04-*`
- Created fresh `work/current_status.md` for test validation phase
- Documented strategic decision and rationale

### 3. Preparation
- Identified ngit-relay location: `../ngit-relay/`
- Confirmed Docker image: `ghcr.io/danconwaydev/ngit-relay:latest`
- Outlined complete test validation plan

---

## 📋 Current State

```
work/
├── README.md                    ✅ (gitignored, explains work/)
└── current_status.md            ✅ (test validation plan)

docs/archive/
├── 2025-11-04-session-summary.md                  ✅ (this session)
├── 2025-11-04-ngit-grasp-implementation-plan.md   ✅ (for later)
├── 2025-11-04-git-http-backend-validation.md      ✅ (architecture)
├── 2025-11-04-test-strategy-decision.md           ✅ (rationale)
├── 2025-11-04-git-http-backend-deep-dive.md       ✅ (crate analysis)
└── 2025-11-04-authorization-flow-diagram.txt      ✅ (visual ref)
```

---

## 🎯 Next Session: Start Here

### Quick Start Command
```bash
# 1. Read the plan
cat work/current_status.md

# 2. Start ngit-relay
cd ../ngit-relay
docker-compose up -d

# 3. Verify it's working
curl http://localhost:8080  # Nostr relay
curl http://localhost:3000  # Git server

# 4. Begin building tests
cd ../ngit-grasp/grasp-audit
nix develop
# Create src/specs/grasp01_git.rs
```

### Timeline
- **Phase 1:** Setup ngit-relay (30 min)
- **Phase 2:** Build GRASP-01 Git tests (1 day)
- **Phase 3:** Validate against ngit-relay (1 day)
- **Phase 4:** Document findings (2 hours)
- **Total:** ~2 days

---

## 📚 Key Documents

### For This Phase (Test Validation)
- **Plan:** `work/current_status.md` ← START HERE
- **Rationale:** `docs/archive/2025-11-04-test-strategy-decision.md`
- **Reference:** `../ngit-relay/README.md`

### For Later (Implementation)
- **Implementation Plan:** `docs/archive/2025-11-04-ngit-grasp-implementation-plan.md`
- **Architecture:** `docs/archive/2025-11-04-git-http-backend-validation.md`
- **Flow Diagram:** `docs/archive/2025-11-04-authorization-flow-diagram.txt`

---

## 🚀 The Goal

**By end of next session:**
- ✅ grasp-audit has complete GRASP-01 Git test suite
- ✅ All tests pass against ngit-relay reference implementation
- ✅ Reference behavior documented
- ✅ Confident test suite ready for ngit-grasp implementation

**Then we can implement ngit-grasp knowing our tests are correct!**

---

## 💡 Why This Approach?

**Question:** Why not just start implementing ngit-grasp?

**Answer:** 
- Testing against reference validates our test suite first
- Eliminates "is it the test or the code?" debugging
- Only 1-2 day investment for weeks of confidence
- Same total timeline but much lower risk

**See:** `docs/archive/2025-11-04-test-strategy-decision.md` for full analysis

---

## ✅ Ready!

**Status:** All planning complete, ready to begin test validation  
**First Step:** `cd ../ngit-relay && docker-compose up -d`  
**Reference:** `work/current_status.md`

Let's build a rock-solid test suite! 🚀