From 1adbd93e5bb8e14403ba64a76d5dc93209227514 Mon Sep 17 00:00:00 2001 From: DanConwayDev Date: Fri, 19 Dec 2025 16:02:04 +0000 Subject: docs: cleanup --- work/phase1-baseline.md | 159 ------------------------------------------------ 1 file changed, 159 deletions(-) delete mode 100644 work/phase1-baseline.md (limited to 'work/phase1-baseline.md') diff --git a/work/phase1-baseline.md b/work/phase1-baseline.md deleted file mode 100644 index 8bd3902..0000000 --- a/work/phase1-baseline.md +++ /dev/null @@ -1,159 +0,0 @@ -# Phase 1: Sync Test Baseline - -**Timestamp:** 2025-12-18T16:50:07Z (UTC) -**Git Commit:** (pre-refactoring baseline) - -## Test Execution Command -```bash -cargo test --test sync -``` - -## Summary Statistics - -- **Total Tests:** 40 -- **Passed:** 38 (95%) -- **Failed:** 2 (5%) -- **Ignored:** 0 -- **Filtered Out:** 0 -- **Execution Time:** 8.05s - -## Passing Tests (38) - -### Common Module Tests (7) -- `common::relay::tests::test_find_free_port` -- `common::sync_helpers::tests::test_parse_empty_metrics` -- `common::sync_helpers::tests::test_parse_counter_with_labels` -- `common::sync_helpers::tests::test_parse_gauge_without_labels` -- `common::sync_helpers::tests::test_parse_metric_with_relay_url_label` -- `common::sync_helpers::tests::test_repo_coord_format` -- `common::sync_helpers::tests::test_build_layer3_comment_with_uppercase_e` - -### Sync Helper Builder Tests (6) -- `common::sync_helpers::tests::test_build_layer3_comment_kind_1` -- `common::sync_helpers::tests::test_build_layer3_quote_with_q` -- `common::sync_helpers::tests::test_build_layer3_comment_kind_1111` -- `common::sync_helpers::tests::test_build_layer2_issue_event` -- `common::sync_helpers::tests::test_build_layer3_reply_with_e_tag` -- `common::sync_helpers::tests::test_build_layer2_issue_with_uppercase_a` -- `common::sync_helpers::tests::test_build_layer2_issue_with_q_tag` - -### Metrics Tests (6 passing) -- `sync::metrics::test_metric_values_are_numeric` -- `sync::metrics::test_concurrent_metrics_requests` -- `sync::metrics::test_metrics_availability_during_sync` -- `sync::metrics::test_connection_failure_increments_counter` -- `sync::metrics::test_prometheus_format_valid` -- `sync::metrics::test_relay_connected_status` -- `sync::metrics::test_health_state_degrades_on_failure` -- `sync::metrics::test_startup_sync_event_count` - -### Live Sync Tests (3) -- `sync::live_sync::test_live_sync_layer2_events` -- `sync::live_sync::test_live_sync_layer3_events` -- `sync::live_sync::test_live_sync_event_ordering` - -### Bootstrap Tests (3) -- `sync::bootstrap::test_announcement_not_listing_relay_is_not_synced` -- `sync::bootstrap::test_history_sync_without_negentropy` -- `sync::bootstrap::test_bootstrap_syncs_existing_layer2_events` -- `sync::bootstrap::test_relay_replays_events_after_restart` - -### Discovery Tests (3) -- `sync::discovery::test_layer2_discovery_with_chain` -- `sync::discovery::test_discovers_layer3_via_layer2` -- `sync::discovery::test_recursive_relay_discovery_syncs_announcement` - -### Tag Variations Tests (6) -- `sync::tag_variations::test_layer2_sync_with_lowercase_a_tag` -- `sync::tag_variations::test_layer2_sync_with_q_tag` -- `sync::tag_variations::test_layer2_sync_with_uppercase_a_tag` -- `sync::tag_variations::test_layer3_sync_with_lowercase_e_tag` -- `sync::tag_variations::test_layer3_sync_with_q_tag` -- `sync::tag_variations::test_layer3_sync_with_uppercase_e_tag` - -## Failing Tests (2) - -### 1. sync::metrics::test_live_sync_event_count - -**Location:** `tests/sync/metrics.rs:444` - -**Error Type:** Assertion failure - -**Details:** -``` -assertion `left == right` failed: Should have 2 live events - left: None - right: Some(2) -``` - -**Root Cause:** Live event counting metric is not being populated. The metric parser is returning `None` when it should find a count of 2 live synced events. - -**Output Sample:** -``` -Live events synced: None -``` - -**Impact:** This suggests that the `sync_events_total{sync_type="live"}` metric either: -- Is not being incremented correctly during live sync -- Is using a different metric name/label than expected -- Is not being exposed in the metrics endpoint - ---- - -### 2. sync::metrics::test_multi_source_aggregate_counts - -**Location:** `tests/sync/metrics.rs:603` - -**Error Type:** Assertion failure - -**Details:** -``` -assertion `left == right` failed: Should have 0 connected - left: Some(1) - right: Some(0) -``` - -**Root Cause:** After stopping a relay connection, the `sync_relays_connected_total` metric is not being decremented. The test expects 0 connected relays after calling stop, but the metric still shows 1. - -**Output Sample:** -``` -Tracked total: Some(1) -Connected total: Some(1) -After stop - Tracked total: Some(1) -After stop - Connected total: Some(1) -``` - -**Impact:** This indicates that relay disconnection is not properly updating the connection count metric. This could be: -- A lifecycle issue where the metric update happens asynchronously after the test assertion -- A bug where the disconnect handler doesn't decrement the counter -- A race condition in the test timing - ---- - -## Analysis - -### Test Health -The sync test suite is in relatively good shape with a 95% pass rate. The failures are both isolated to the metrics module and appear to be either timing/synchronization issues or metric collection bugs rather than fundamental sync logic problems. - -### Pre-existing Issues -Both failing tests appear to be pre-existing issues unrelated to the planned refactoring work. They should be tracked separately and not conflated with any issues introduced during the refactor. - -### Refactoring Risk Assessment -- **Low Risk Areas:** Bootstrap, discovery, live_sync, tag_variations modules are all passing -- **Medium Risk Area:** Metrics tests have 2 failures, but they're specific to metric collection, not sync functionality -- **Safe to Refactor:** The core sync logic tests are passing, so structural refactoring of test helpers and organization should not affect test outcomes - -## Next Steps - -This baseline will be used to: -1. Verify that refactoring doesn't introduce new failures -2. Distinguish pre-existing failures from regressions -3. Track if the refactoring inadvertently fixes the existing failures -4. Ensure that after refactoring, we still have 38 passing tests (or more if we fix the failing ones) - -## Notes - -- Both failures are in `tests/sync/metrics.rs` -- The failures appear to be metric collection/timing issues rather than sync logic bugs -- All functional sync tests (bootstrap, discovery, live_sync, tag_variations) are passing -- The refactoring should not affect these test results unless we accidentally change metric collection timing \ No newline at end of file -- cgit v1.2.3